Offgrid Water Installation Services
We can help with installation and maintenance in the highlighted area.
Typical installation: £200–£450, depending on the work involved. Contact us for a quote.
Choose your water system, find an installer or get help with a system you already own.
Already own a system? Installation guides · Troubleshooting · Warranty & support
You don't need to install Stage One. It's portable and can be used to fill your tank without being permanently plumbed in. If you're fitting Stage Two, FinalStage RO or a permanent setup, follow the instructions for those components.
Open the installation and customer guide
Stage One specifications · Offgrid Rain specifications · Stage Two specifications · FinalStage RO specifications
Earlier versions may have different pumps or fittings. If you're unsure, send us the model, water source and a photo of your setup so we can help.
We can help with installation and maintenance in the highlighted area.
Typical installation: £200–£450, depending on the work involved. Contact us for a quote.
Enter your postcode to see nearby installers and approximate distances in miles. Contact them to check availability and where the work will take place.
Choose a region, or use your postcode above to find the closest listed options.
No installer is currently listed specifically for this region. Try your postcode above or ask us about installation.
We can help with installation and maintenance in the highlighted area.
Typical installation: £200–£450, depending on the work involved. Contact us for a quote.
London, east of King's Cross
Uxbridge area. Based at Willow Tree Marina, Hayes.
Boats and other installations from Bristol through Oxfordshire, outside the highlighted Offgrid Water service area.
07771 881060
Wells, East Somerset and surrounding area
Devizes to Bristol, western Kennet & Avon Canal
Cornwall, Devon and Somerset. Based in Plymouth.
07545 240730
Approximately 30 miles around Littleport, Cambridgeshire. Boat installations.
07740 199304
Boat installations in Cambridgeshire, Peterborough and Bedford.
07472 630713
Ashby Canal and Bosworth Marina
Burton upon Trent. Contact the marina to arrange installation.
Kings Lock Boatyard, Middlewich, Cheshire. Contact Artie to arrange installation.
+44 7970 151996
Ceredigion
07738 017203
South Wales, including the Monmouthshire & Brecon Canal. Based in Bridgend.
01656 720498
Highlands and Islands, including Coll, Mull, Barra and Orkney.
07951 479355
All Northern Ireland and County Donegal. Workshop in Fahan.
07836 327272
Antrim and the North Coast. Homes and cabins; wider travel by agreement.
07598 913799
Choose an installer to see their coverage. Contact them to confirm availability.
Other listed installers are independent businesses. Agree their work and costs directly with them; they are responsible for their availability, pricing and workmanship.
Choose the model fitted to your system, including its revision. Keep its labels and supplied instructions with your installation record.
For canal, river or collected-rainwater drinking and cooking, use suitable pre-filtration followed by FinalStage RO. These systems are for freshwater, not saltwater or brackish-water desalination. Known pollution or unusual chemical contamination needs a source-specific assessment.
If water may be unsafe, use a known-safe drinking and cooking supply while the cause is checked. Clear water, taste, boiling and a TDS reading do not establish drinking-water safety.
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
Typical route: source → Stage One → storage tank → onboard pump/accumulator → optional Stage Two → domestic outlets. A suitable branch supplies FinalStage RO for drinking and cooking.
Stage One’s transfer pump must not drive Stage Two directly. Use a separate onboard pressure pump after the storage tank.
Pumps push more effectively than they pull. For a straightforward setup, aim for the pump no more than 50 cm above the source and an inlet no longer than 2 m, preferably with the pump level with the water. These are conservative setup guides, not guaranteed maximums for every revision. If the lift or route is greater, send us the measurements before selecting an auxiliary pump.
An outlet-run rating is different from suction lift. Do not apply current V3.1 figures to an older pump or assume a stated distance guarantees the same flow.
Stage One uses six standard slimline 10 × 2.5-inch cartridges. Confirm the labels fitted to your unit before ordering. Follow water-flow direction, not just the position viewed from the front.
| Position | Cartridge |
|---|---|
| A | 30–50-micron wound sediment |
| B | 10-micron sediment |
| C | 5-micron sediment |
| D | GAC or a compatible carbon block |
| E | Carbon block |
| F | 1-micron sediment |
Change only the cartridge that is due. Replacing A does not reset B–F, and D and E have separate service histories. Record each new cartridge in the app when fitted.
In medium canal conditions, consider inspecting A around 1,500–2,000 litres. Heavy sediment can clog it within 750 litres. Review D and E individually from 2,000–3,000 litres; this is a review point, not a fixed replacement deadline. Follow each cartridge’s capacity and time limits, with earlier changes where source conditions require them.
Normal flow or acceptable taste does not show how much carbon capacity remains. The app’s volume estimates help plan checks; they are not a measured cartridge capacity or water-safety result.
Some earlier low-sediment configurations used A: 5-micron sediment; B: 1-micron sediment; C: nitrate removal; D: GAC; E: carbon block; F: NanoCeram. Match your actual labels rather than changing a working unit to this sequence automatically.
NanoCeram at Stage One F is for an appropriately configured, relatively clear source, not canal water, turbid water or lower-course rivers. Its 10,000–20,000-litre guide depends on source loading and the fitted cartridge’s limits. An older “camper” label does not itself establish drinking-water suitability.
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
Stage Two needs an existing pressurised supply and uses no electricity. It can treat suitable stored water, mains water or feed water for RO. In a tank-fed installation, fit it after the onboard pump and normally after the accumulator. Do not feed it directly from Stage One’s transfer pump.
The current Stage Two maximum is 60 psi. Available flow also depends on pump pressure, pipework and cartridge restriction. NanoCeram is less restrictive than some alternatives; it does not eliminate pressure loss.
| Position | Cartridge |
|---|---|
| A | Nitrate removal or GAC, selected for the source |
| B | 1- or 5-micron carbon block |
| C | UF membrane or Argonide NanoCeram, according to your configuration |
Match the 10 × 2.5-inch format, filter type, rating and direction. Standard cartridges commonly need review within about 4–8 months; the fitted cartridge instructions and source loading govern the actual change. NanoCeram at C has separate guidance of 6–12 months, sooner if needed.
NanoCeram replaces the final cartridge; do not count both UF and NanoCeram in the same housing. If you change the cartridge type, update its label in the app so the picture and reminder match.
Reduced flow can come from a restricted cartridge, but also from supply pressure, air or pipework. Check the low-flow guide before replacing every cartridge. A UF micron rating alone does not prove removal of every pathogen or chemical.
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
Typical route: rainwater tank → pre-strainer → Rain V2.0 → domestic outlets, with a branch to FinalStage RO → separate drinking-water tap. RO also needs its waste connection.
Rain V2.0 includes a small accumulator, brushless pump, three standard 10-inch cartridges and LED UV-C. The rainwater collection system, storage tank and connecting pipework are separate. A second tank between Rain and the outlets is not required.
The current unit is approximately W65 × H37 × D12 cm. Typical output is 10–12 litres/minute, depending on the installation and filter condition. Protect the whole water path from freezing, including pump and UV chamber.
Rain V2.0 uses three standard 10 × 2.5-inch cartridges. Match your fitted sediment and carbon prefilters at A and B. The drinking-water bundle uses NanoCeram at C; other Rain configurations and earlier models can differ.
The standard filter-set planning guide is 12,000 litres or six months, whichever comes first. This is a practical planning benchmark, not a tested capacity. Source loading and each cartridge’s instructions may require an earlier change.
With NanoCeram at C, maintain A and B separately from C. NanoCeram’s guide is 6–12 months, depending on source and use. It replaces the standard C cartridge.
A Rain drinking-water bundle has five replaceable cartridges in total: three in Rain and two in RO. You do not change all five together. Follow the separate paired PCT + RO procedure for the RO unit.
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
FinalStage RO supplies drinking and cooking water at approximately 1.6 litres/minute. Use suitable pre-filtered water and keep the unit indoors, dry and protected from frost.
The A8 manual specifies municipal tap water, feed pressure 1–4 bar, feed temperature 5–38°C and ambient temperature 5–45°C. A private-water installation needs suitable treatment to meet its feed requirements.
Use the actual unit and adapter labels for electrical sizing. Published 75 W information differs from the A8 manual’s 95 W specification. The front Power button controls the display; disconnect the supply to electrically isolate the unit.
Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)
Direct the initial RO output to waste. Initial carbon fines or preservative can make it look cloudy or discoloured; appearance alone is not a commissioning check.
Offgrid’s practical flushing guidance is around ten minutes, based on field experience. The A8 manufacturer’s full first-use conditioning sequence is longer: one hour of production, a 24-hour rest with the tap closed, then another hour of production. Follow the supplied technical instructions; the ten-minute practical flush is not equivalent to the full manufacturer conditioning procedure.
Keep both cartridges fitted and all internal tubing connected. Do not bypass a protective timeout. Check the feed, waste path and all connections for leaks before use.
After replacement cartridges, use the separate 5–10-minute post-change procedure below.
Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)
Offgrid’s routine service schedule is to replace the PCT and RO cartridges together every two years. Use the fitted cartridges’ limits and condition; reduced performance or contamination may require earlier attention. In the app, one Both filters changed action records the pair.
Offgrid’s paired two-year schedule is its service policy, not a tested cartridge capacity or water-safety guarantee. The supplied A8 manual gives reference intervals of PCT 8–12 months and RO 12–24 months under its stated mains-water conditions. Respect any earlier limit specified for your fitted cartridges.
Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)
Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.
After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.
Isolate the water and power and relieve pressure before fitting the module. Follow its flow arrow and use the supplied connections and power adapter. Restore flow, then check the joints for leaks and the indicator against the instructions for your module.
Current LED UV-C modules operate with clear, pre-filtered water. The standalone unit should follow the relevant filtration stage; in the Complete Bundle this is normally after Stage Two and before the RO feed branch.
LED UV needs no routine servicing or scheduled bulb changes. A recorded hours-used figure is a usage estimate, not a measured remaining lifespan. Investigate a fault or abnormal indicator when it occurs instead of waiting for a time limit.
The current Stage One V3.1, Rain V2.0 and standalone LED modules use the supplier-reported dose figure of 50.8 mJ/cm² from disinfection testing. Performance depends on flow and water clarity. This is not an independently certified rating or a guaranteed dose at maximum flow.
Some earlier Stage One and Rain units used conventional non-LED lamps. Those need their own lamp and sleeve instructions; do not apply LED guidance to them. Check the fitted lamp’s part number, size, power and maintenance schedule before ordering a replacement.
GAC, nitrate-removal, refillable and UF cartridges can be directional. Follow their own arrows and seal instructions; similar-looking cartridges can differ. Many standard sediment cartridges are reversible, but confirm the actual design.
If a new cartridge has a different rating or type, update the app’s fitted-cartridge selection. Do not automatically copy an old reminder to a different cartridge.
Stop if the pump runs without water, overheats or repeatedly cuts out. Do not keep restarting it against a blockage.
Send support a photo of the layout, the unit/pump label, inlet height and hose length, which cartridges are fitted, and when the fault started. A short video with the sound and a measured flow helps.
A controlled cartridge-isolation or clean-bucket test may help identify a restriction, but follow the procedure for the actual model. Keep all diagnostic output out of the drinking supply, isolate and depressurise between changes, and restore every treatment stage before use.
A steady pump sound alone does not prove that it is properly primed. Do not run it for a fixed ten minutes hoping a blockage will clear, and do not remove safety devices.
Do not bypass thermal or pressure protection, fit a larger fuse to overcome a fault, or adjust an unidentified pressure-switch screw. Live electrical readings and enclosure work require a competent person.
On-demand pumps normally stop when outlets close. Unexpected rapid cycling or failure to build pressure needs investigation.
Do not guess an accumulator pressure or turn a pressure-switch adjustment screw. Send a photo and the pump label if the basic checks do not resolve it.
Leave a cracked housing or damaged electrical area out of use. Send a close-up photo and your unit details to support for a compatible part.
If a cartridge indicator remains on after a change, follow the exact Reset/Select procedure above for each cartridge. Do not unplug internal tubing or bypass a timeout to clear it.
A TDS reading measures dissolved material, not bacteria or overall drinking safety. Unexpected taste, odour or contamination needs investigation even if TDS is low. Use a known-safe drinking supply while a suspected quality problem is checked.
Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)
A fishy, stagnant or unusual smell can come from the source, tank, hoses, housings, old cartridges or biofilm. It is not proof of a pump fault. If the water may be unsafe, stop using it for drinking and cooking while it is assessed.
Do not use a generic teaspoon dose or a universal recirculation time. Tank cleaners and treatment tablets differ in concentration and compatibility. If the smell returns, investigate the whole water path rather than repeatedly adding cleaner.
Keep strainers clear, maintain tank hygiene and change cartridges according to their own limits. Removing a smell alone does not prove the water is safe.
Water left in filters, tanks and pipework can become stale, especially in warm weather. A period without use may mean a cartridge needs replacing earlier.
The app’s water-use calendar pauses assumed usage during time away. It does not pause calendar ageing or establish that stored water and cartridges are hygienic. Flushing for a fixed number of minutes cannot guarantee safety after every period of non-use.
Freezing can damage pumps, housings, UV chambers, cartridges and RO components. Keep the complete installation frost-protected and follow the fitted equipment’s storage procedure.
Draining a visible housing does not prove that the pump, UV chamber or RO is empty. Do not assume a cartridge or membrane can be allowed to dry. Ask for the model-specific storage method if it is not covered by the supplied instructions.
For fixed installations, keep isolation and the flush-to-waste route accessible. On return, inspect for damage and follow the restart guidance before using the water.
Frame-mounted, wall-mounted, V1, V2, V2.1, Mini, Explorer and earlier Rain units can have different pumps, power supplies, dimensions and UV hardware. A current V3.1 drawing or spare part is not automatically compatible.
Send support a photo of the unit and component label if you need the correct earlier-model instructions or a replacement part.
Match your fitted cartridge’s size, type and micron rating.
| Cartridge | Supplier |
|---|---|
| 50-micron wound sediment | View on Amazon UK |
| 10-micron wound sediment | View on Amazon UK |
| 5-micron wound sediment | View on Amazon UK |
| 5-micron sediment | View on Amazon UK |
| 1-micron wound sediment | View on Amazon UK |
| Granular activated carbon (GAC) | View on Amazon UK |
| 5-micron carbon block | View on Amazon UK |
| FilterLogic NR600 nitrate cartridge | View on Amazon UK |
Amazon UK links. We may earn a commission from qualifying purchases.
For standard cartridges, match the 10 × 2.5-inch size, filter type, micron rating, direction and seal design. Similar-looking GAC, nitrate, UF and NanoCeram cartridges do different jobs. Check multipack quantities when comparing prices.
The 20-cartridge Stage One pack is a supply for staggered changes, not a requirement to replace all six filters together or discard the box at six months. The confirmed contents are 5 × 30-micron wound, 4 × 10-micron wound, 3 × 5-micron wound, 4 × carbon block, 2 × GAC and 2 × 1-micron melt-blown sediment.
Use the filter cost calculator for editable source- and usage-based budgeting. It distinguishes individual Stage One changes, Rain’s prefilters and NanoCeram, Stage Two and the paired RO set.
Replacement pumps, switches, UV parts and power supplies need an exact component match. Send the label and a photo rather than selecting a generic part by voltage alone. Current availability and prices are shown in the shop.
Test strips can help track selected parameters, but they do not test every contaminant or establish overall drinking safety. Use appropriate laboratory testing when assessing a private source, unexplained changes or suspected contamination.
Record the sample date, source or treated-water location, installed treatment stages and cartridge condition. Source and treated samples answer different questions. A filter or UV performance claim applies only within its documented conditions.
Do not collect from a known pollution event or assume that clear water has no dissolved contamination. If the drinking supply is suspect, use a known-safe alternative while it is assessed.
Email hello@offgridwater.net with your order number, model, symptoms and when they began. Include a photo of the installation, the relevant component label and any leak or indicator. For flow problems, add the source height, hose length and fitted cartridges.
You can contact us before completing a troubleshooting sequence, especially for a leak, electrical damage or water-quality concern. Do not attempt an unsafe check to qualify for support.
Current general warranty guidance is two years for systems and one year for pumps, subject to the applicable purchase terms and your statutory rights. We will assess the fault and the appropriate remedy; a troubleshooting result alone is not an automatic replacement authorisation.
Find installation help for plumbing work or a fixed installation.
No matching guidance. Try a different term or choose All systems.
Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)
English edition for model A8.
Send your order number, unit, water source and a short description. A photo of the setup or video of the fault helps.
We're here to help with your system. Our warranty is a parts warranty: we supply the replacement part, you fit it, and we'll help you through it. We've made components as straightforward to replace as possible. Callouts aren't included.
Systems have a two-year warranty for covered mechanical and electrical faults. Pumps have a one-year warranty, unless your product listing states otherwise. Routine maintenance, wear and exhausted consumables aren't covered. Your statutory rights are unaffected.