Installation & support

Choose your water system, find an installer or get help with a system you already own.

Installation and local help

You don't need to install Stage One. It's portable and can be used to fill your tank without being permanently plumbed in. If you're fitting Stage Two, FinalStage RO or a permanent setup, follow the instructions for those components.

Open the installation and customer guide

Before you install

  • Check the dimensions, voltage, fittings and flow rate on the page for your exact model. Leave room for connections and filter changes.
  • Confirm the mounting position, water source and hose route. Stage One needs an auxiliary priming pump when installed more than one metre above the waterline.
  • Stage Two has no pump. Install it after your existing onboard pump or accumulator. Do not use the Stage One pump to drive Stage Two.
  • Arrange any non-standard fittings or custom plumbing with us before ordering.
  • Follow the flushing and commissioning instructions, protect the system from frost and check for leaks after installation or maintenance.

Stage One specifications · Offgrid Rain specifications · Stage Two specifications · FinalStage RO specifications

Earlier versions may have different pumps or fittings. If you're unsure, send us the model, water source and a photo of your setup so we can help.

Installation & maintenance

We can help with installation and maintenance in the highlighted area.

Typical installation: £200–£450, depending on the work involved. Contact us for a quote.

Browse installers by region

Choose a region, or use your postcode above to find the closest listed options.

London & South East

Offgrid Water Installation Services

We can help with installation and maintenance in the highlighted area.

Typical installation: £200–£450, depending on the work involved. Contact us for a quote.

Bristol & Oxfordshire

Milners Marine

Boats and other installations from Bristol through Oxfordshire, outside the highlighted Offgrid Water service area.

07771 881060

South West

East of England

Tom Stoneham, T.J. Stoneham Marine Services

Approximately 30 miles around Littleport, Cambridgeshire. Boat installations.

07740 199304

East Midlands

West Midlands

North West

Artie Chambers, Elton Moss Boats

Kings Lock Boatyard, Middlewich, Cheshire. Contact Artie to arrange installation.

+44 7970 151996

Wales

Phil Hearne, GGF Boat Repair Centre

South Wales, including the Monmouthshire & Brecon Canal. Based in Bridgend.

01656 720498

Highlands & Islands

Larry, LSMann

Highlands and Islands, including Coll, Mull, Barra and Orkney.

07951 479355

Northern Ireland & Donegal

Aaron Henry, Mr. Water Plumbing & Heating

Antrim and the North Coast. Homes and cabins; wider travel by agreement.

07598 913799

Installer coverage

Choose an installer to see their coverage. Contact them to confirm availability.

Offgrid WaterIndependent installers
Loading map…

Other listed installers are independent businesses. Agree their work and costs directly with them; they are responsible for their availability, pricing and workmanship.

Help & troubleshooting

Start hereChoose your unit and follow the water through your installation.

Choose the model fitted to your system, including its revision. Keep its labels and supplied instructions with your installation record.

  • Stage One: filters source water into a storage tank for domestic use.
  • Stage Two: treats an existing pressurised supply, including suitable tank water or mains water.
  • Offgrid Rain: draws from a rainwater tank and supplies domestic outlets on demand.
  • FinalStage RO: supplies drinking and cooking water from its separate tap, after suitable pre-filtration.
  • LED UV-C: treats clear, pre-filtered water within the fitted module’s operating limits.

For canal, river or collected-rainwater drinking and cooking, use suitable pre-filtration followed by FinalStage RO. These systems are for freshwater, not saltwater or brackish-water desalination. Known pollution or unusual chemical contamination needs a source-specific assessment.

If water may be unsafe, use a known-safe drinking and cooking supply while the cause is checked. Clear water, taste, boiling and a TDS reading do not establish drinking-water safety.

Before installationCheck space, fittings, power and a route for flushing to waste.
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

Stage One: setup and first fillA short, airtight inlet and a submerged strainer make priming easier.
Water in
Freshwater intake with strainers
Water out
Storage tank, after flushing
Before you start
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

Typical route: source → Stage One → storage tank → onboard pump/accumulator → optional Stage Two → domestic outlets. A suitable branch supplies FinalStage RO for drinking and cooking.

  1. Stand or secure the unit close to the water source. Keep the inlet short, low and direct, avoiding loops over railings or windows.
  2. Attach the supplied intake strainer. Keep it submerged, roughly 15 cm below the surface where conditions allow, clear of bottom sediment and floating debris. Fit any supplied secondary pre-strainer before the pump.
    Brass foot valve at the submerged end of the hose
    Inline mesh strainer before the pump
  3. Cut and attach hoses to the marked inlet and outlet using the supplied compatible fittings and clips. Check seals and secure clips without stripping them or crushing the hose.
  4. Direct the outlet to waste for flushing, away from the tank filler. Confirm the source has water before starting.
  5. Use only the power connection supplied for your particular revision. Connect the inlet and prime according to the fitted pump instructions; stop if water is not drawing.
  6. Flush before the first tank fill. Offgrid’s initial Stage One guide is at least two minutes; newly fitted cartridges may require a longer manufacturer flush. Check for leaks and carbon fines before directing the outlet into your tank.

Stage One’s transfer pump must not drive Stage Two directly. Use a separate onboard pressure pump after the storage tank.

Source height and hose length

Pumps push more effectively than they pull. For a straightforward setup, aim for the pump no more than 50 cm above the source and an inlet no longer than 2 m, preferably with the pump level with the water. These are conservative setup guides, not guaranteed maximums for every revision. If the lift or route is greater, send us the measurements before selecting an auxiliary pump.

An outlet-run rating is different from suction lift. Do not apply current V3.1 figures to an older pump or assume a stated distance guarantees the same flow.

Stage One: identify your six filtersMatch A–F to your fitted configuration and change cartridges individually.

Stage One uses six standard slimline 10 × 2.5-inch cartridges. Confirm the labels fitted to your unit before ordering. Follow water-flow direction, not just the position viewed from the front.

Typical canal and river configuration
Position Cartridge
A 30–50-micron wound sediment
B 10-micron sediment
C 5-micron sediment
D GAC or a compatible carbon block
E Carbon block
F 1-micron sediment

Change only the cartridge that is due. Replacing A does not reset B–F, and D and E have separate service histories. Record each new cartridge in the app when fitted.

In medium canal conditions, consider inspecting A around 1,500–2,000 litres. Heavy sediment can clog it within 750 litres. Review D and E individually from 2,000–3,000 litres; this is a review point, not a fixed replacement deadline. Follow each cartridge’s capacity and time limits, with earlier changes where source conditions require them.

Normal flow or acceptable taste does not show how much carbon capacity remains. The app’s volume estimates help plan checks; they are not a measured cartridge capacity or water-safety result.

Earlier clear-source and camper configurations

Some earlier low-sediment configurations used A: 5-micron sediment; B: 1-micron sediment; C: nitrate removal; D: GAC; E: carbon block; F: NanoCeram. Match your actual labels rather than changing a working unit to this sequence automatically.

NanoCeram at Stage One F is for an appropriately configured, relatively clear source, not canal water, turbid water or lower-course rivers. Its 10,000–20,000-litre guide depends on source loading and the fitted cartridge’s limits. An older “camper” label does not itself establish drinking-water suitability.

Stage Two: installationFit after the supply pump, with the correct cartridge order and direction.
Water in
Pressurised cold water
Water out
Filtered cold supply
Before you start
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

Stage Two needs an existing pressurised supply and uses no electricity. It can treat suitable stored water, mains water or feed water for RO. In a tank-fed installation, fit it after the onboard pump and normally after the accumulator. Do not feed it directly from Stage One’s transfer pump.

  1. Isolate water and power to the supply pump, then open an outlet to relieve pressure.
  2. Mount securely with room below to remove the housings. The current unit body is approximately W35 × D15 × H35 cm; allow additional service and connection space.
  3. Follow the arrows on the housings and fitted cartridges. A nitrate-removal cartridge, when supplied at A, goes first in that configured sequence.
  4. Cut compatible pipe squarely and fit the supplied connectors. Use appropriate inserts for plastic pipe as required by its fitting instructions; do not assume an insert is suitable for copper.
    Stage Two with a UK hose and fittings kit
  5. Seat cartridges and seals correctly and close the housings according to their instructions. Do not force a cross-threaded housing.
  6. Flush new carbon to waste before it feeds a UF or other sensitive final cartridge. Isolate and depressurise before removing or refitting any downstream cartridge; restore the complete treatment train before use.
  7. Restore the supply gradually, bleed trapped air, flush the fitted cartridges and check all joints for leaks.

The current Stage Two maximum is 60 psi. Available flow also depends on pump pressure, pipework and cartridge restriction. NanoCeram is less restrictive than some alternatives; it does not eliminate pressure loss.

Stage Two: filters and replacementUse the cartridge actually fitted, including UF or NanoCeram at C.
Common Stage Two configuration
Position Cartridge
A Nitrate removal or GAC, selected for the source
B 1- or 5-micron carbon block
C UF membrane or Argonide NanoCeram, according to your configuration

Match the 10 × 2.5-inch format, filter type, rating and direction. Standard cartridges commonly need review within about 4–8 months; the fitted cartridge instructions and source loading govern the actual change. NanoCeram at C has separate guidance of 6–12 months, sooner if needed.

NanoCeram replaces the final cartridge; do not count both UF and NanoCeram in the same housing. If you change the cartridge type, update its label in the app so the picture and reminder match.

Reduced flow can come from a restricted cartridge, but also from supply pressure, air or pipework. Check the low-flow guide before replacing every cartridge. A UF micron rating alone does not prove removal of every pathogen or chemical.

Offgrid Rain V2.0: installationConnect your tank to Rain, then feed domestic outlets and an optional RO branch.
Water in
Rainwater tank via the pre-strainer
Water out
Domestic taps
Before you start
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

Typical route: rainwater tank → pre-strainer → Rain V2.0 → domestic outlets, with a branch to FinalStage RO → separate drinking-water tap. RO also needs its waste connection.

  1. Use a suitable clean rainwater tank. For a reused IBC, confirm its previous contents and suitability for water storage.
  2. Mount Rain on a secure wall in a dry, frost-protected position near the tank. The keyhole mounting centres are 623 mm apart. Leave enough space below the housings for cartridge changes.
  3. Fit the supplied pre-strainer before the inlet and follow the marked flow direction. Keep the inlet short and direct and the pump supplied with water.
  4. Connect the filtered outlet to the domestic supply. Keep any FinalStage RO unit indoors and dry.
  5. Use the supplied power connection appropriate to your unit, flush the fitted cartridges to waste and check every connection for leaks before leaving the system in use.

Rain V2.0 includes a small accumulator, brushless pump, three standard 10-inch cartridges and LED UV-C. The rainwater collection system, storage tank and connecting pipework are separate. A second tank between Rain and the outlets is not required.

The current unit is approximately W65 × H37 × D12 cm. Typical output is 10–12 litres/minute, depending on the installation and filter condition. Protect the whole water path from freezing, including pump and UV chamber.

Offgrid Rain: cartridge changesRain has three filters; the RO in a drinking-water bundle has a separate pair.

Rain V2.0 uses three standard 10 × 2.5-inch cartridges. Match your fitted sediment and carbon prefilters at A and B. The drinking-water bundle uses NanoCeram at C; other Rain configurations and earlier models can differ.

The standard filter-set planning guide is 12,000 litres or six months, whichever comes first. This is a practical planning benchmark, not a tested capacity. Source loading and each cartridge’s instructions may require an earlier change.

With NanoCeram at C, maintain A and B separately from C. NanoCeram’s guide is 6–12 months, depending on source and use. It replaces the standard C cartridge.

A Rain drinking-water bundle has five replaceable cartridges in total: three in Rain and two in RO. You do not change all five together. Follow the separate paired PCT + RO procedure for the RO unit.

FinalStage RO: installationCold feed, drinking-water tap, waste connection and supplied power conversion.
Water in
Suitably pre-filtered cold water
Water out
Separate lines to the RO tap and drain
Before you start
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

FinalStage RO supplies drinking and cooking water at approximately 1.6 litres/minute. Use suitable pre-filtered water and keep the unit indoors, dry and protected from frost.

  1. Measure the cupboard and allow access to the cartridges and connections. The current unit body is approximately W14 × D45 × H40 cm.
  2. Fit the separate drinking-water tap. The supplied tap requires a 23 mm worktop hole; stone or composite worktops may need specialist drilling.
  3. Connect the cold feed using the supplied compatible tee and isolation valve. The UK connection is normally ½-inch BSP; check your kit and plumbing.
  4. Connect the reject-water line using the matched drain fitting. For the supplied saddle on suitable 40 mm waste pipe, the guide specifies a 5 mm hole in the top of the pipe, the sealing pad and a correctly oriented non-return valve near the waste connection. Follow the full drain instructions and protect against backflow.
    Reject-water tube and drain clamp
  5. Connect the supplied power adapter or approved conversion. The RO unit itself is 24 V. A 12 V connection option uses the supplied conversion; do not connect an unverified 12 V supply directly to the internal unit.
  6. Follow first-use conditioning, confirm that the reject path works and check all joints for leaks.
Feed-water and power limits

The A8 manual specifies municipal tap water, feed pressure 1–4 bar, feed temperature 5–38°C and ambient temperature 5–45°C. A private-water installation needs suitable treatment to meet its feed requirements.

Use the actual unit and adapter labels for electrical sizing. Published 75 W information differs from the A8 manual’s 95 W specification. The front Power button controls the display; disconnect the supply to electrically isolate the unit.

Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)

RO: first-use flushingFirst installation and replacement-cartridge flushing are different procedures.

Direct the initial RO output to waste. Initial carbon fines or preservative can make it look cloudy or discoloured; appearance alone is not a commissioning check.

Offgrid’s practical flushing guidance is around ten minutes, based on field experience. The A8 manufacturer’s full first-use conditioning sequence is longer: one hour of production, a 24-hour rest with the tap closed, then another hour of production. Follow the supplied technical instructions; the ten-minute practical flush is not equivalent to the full manufacturer conditioning procedure.

Keep both cartridges fitted and all internal tubing connected. Do not bypass a protective timeout. Check the feed, waste path and all connections for leaks before use.

After replacement cartridges, use the separate 5–10-minute post-change procedure below.

Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)

RO: change PCT + RO and reset the indicatorsReplace the pair together, reset both indicators and flush to waste.

Offgrid’s routine service schedule is to replace the PCT and RO cartridges together every two years. Use the fitted cartridges’ limits and condition; reduced performance or contamination may require earlier attention. In the app, one Both filters changed action records the pair.

  1. Close the feed, relieve pressure through the RO tap and disconnect electrical power. The front Power button alone does not isolate electricity.
  2. Open the cover and replace both twist-lock cartridges, following the lock markings. Keep the internal tubing connected.
  3. Restore the water supply and power and check for leaks.
  4. Hold Reset for three seconds. Tap Select until the changed cartridge’s indicator flashes. Within the ten-second reset window, hold Reset for three seconds to confirm.
  5. Repeat the indicator reset for the other changed cartridge. The unit’s two indicators reset individually even though the app records the pair together.
  6. Hold Select for three seconds to start the built-in flush. With both cartridges fitted, run the RO tap to waste for 5–10 minutes, then check again for leaks.
About the replacement schedule

Offgrid’s paired two-year schedule is its service policy, not a tested cartridge capacity or water-safety guarantee. The supplied A8 manual gives reference intervals of PCT 8–12 months and RO 12–24 months under its stated mains-water conditions. Respect any earlier limit specified for your fitted cartridges.

Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)

LED UV-C: operation and fault checksNo routine servicing or scheduled bulb changes for the LED module.
Water in
Clear, pre-filtered water
Water out
Treated supply
Before you start
  1. Check the delivery for damage and match the unit, cartridges and power supply to your order.
  2. Measure the space, including room to remove housings or cartridges and reach isolation valves. Product dimensions are not a service-clearance allowance.
  3. Plan the inlet, outlet, electrical supply and a controlled flush-to-waste route. Keep the equipment dry and protected from freezing.
  4. Check pipe materials and fitting sizes. UK kits commonly use 15 mm pipe and ½-inch BSP connections; overseas and earlier kits can differ.
  5. Have a bucket, clean cloths, measuring tools, suitable pipe cutters, adjustable spanners and screwdrivers ready. Use the supplied housing spanner where required.

Isolate electricity and water, then relieve pressure before opening a housing or changing a connection. Fixed wiring and unfamiliar plumbing should be completed by a competent installer. Never open a mains enclosure or alter wiring while energised.

After installation, changes or transport, flush as instructed and check every connection for leaks before unattended use.

Isolate the water and power and relieve pressure before fitting the module. Follow its flow arrow and use the supplied connections and power adapter. Restore flow, then check the joints for leaks and the indicator against the instructions for your module.

Current LED UV-C modules operate with clear, pre-filtered water. The standalone unit should follow the relevant filtration stage; in the Complete Bundle this is normally after Stage Two and before the RO feed branch.

LED UV needs no routine servicing or scheduled bulb changes. A recorded hours-used figure is a usage estimate, not a measured remaining lifespan. Investigate a fault or abnormal indicator when it occurs instead of waiting for a time limit.

  1. Identify the fitted module and its indicator instructions. Do not assume that indicator colours mean the same thing across revisions.
  2. Check that water is flowing as intended and is suitably pre-filtered.
  3. Isolate power before checking accessible plugs and connections. Use the matched supplied power adapter.
  4. If the status remains abnormal, contact support with the module label and symptoms. Never open an energised UV chamber, look at exposed UV or bypass a safety device.
UV performance and earlier units

The current Stage One V3.1, Rain V2.0 and standalone LED modules use the supplier-reported dose figure of 50.8 mJ/cm² from disinfection testing. Performance depends on flow and water clarity. This is not an independently certified rating or a guaranteed dose at maximum flow.

Some earlier Stage One and Rain units used conventional non-LED lamps. Those need their own lamp and sleeve instructions; do not apply LED guidance to them. Check the fitted lamp’s part number, size, power and maintenance schedule before ordering a replacement.

Change a standard 10-inch filterIsolate, depressurise, fit the right cartridge, flush and check for leaks.
  1. Identify the cartridge and record its position. Match the 10 × 2.5-inch size, type, micron rating and seals.
  2. Switch off and isolate electrical power to the relevant pump. Close the water supply and open a suitable outlet to relieve pressure.
  3. Put a bucket below the housing. Open it using the supplied housing tool as instructed.
  4. Remove the old cartridge. Clean the housing using a method compatible with its materials and inspect the O-ring and threads. Replace damaged seals or housings.
  5. Fit the new cartridge the right way round and seat its seals. Refit the housing without cross-threading or excessive force.
  6. Restore the supply gradually and flush to waste according to the cartridge instructions. Flush new carbon before it feeds a sensitive downstream UF cartridge.
  7. Restore the complete treatment train and check for leaks. Record only the cartridge you changed in the app.

GAC, nitrate-removal, refillable and UF cartridges can be directional. Follow their own arrows and seal instructions; similar-looking cartridges can differ. Many standard sediment cartridges are reversible, but confirm the actual design.

If a new cartridge has a different rating or type, update the app’s fitted-cartridge selection. Do not automatically copy an old reminder to a different cartridge.

Low flow or splutteringCheck the source and restrictions before replacing filters.
  1. Confirm that there is water at the inlet, the intake is submerged and the source has not dropped.
  2. Clean the intake and secondary strainers. Check both inlet and outlet for kinks, crushed hose, tight bends and closed valves.
  3. Check the inlet connections for air leaks, loose clips, cracked hose or poorly seated seals. Air can enter without an obvious outward water leak.
  4. Keep the inlet short and low. If flow changes with source height, review suction lift and priming.
  5. Check the age, condition and actual type of each filter. Replace a cartridge that is restricted or beyond its service limit, rather than changing all cartridges automatically.
  6. For Stage Two or RO, check the separate supply pump and available feed pressure. Cold water and restrictive pipework can reduce flow.

Stop if the pump runs without water, overheats or repeatedly cuts out. Do not keep restarting it against a blockage.

If the cause is still unclear

Send support a photo of the layout, the unit/pump label, inlet height and hose length, which cartridges are fitted, and when the fault started. A short video with the sound and a measured flow helps.

A controlled cartridge-isolation or clean-bucket test may help identify a restriction, but follow the procedure for the actual model. Keep all diagnostic output out of the drinking supply, isolate and depressurise between changes, and restore every treatment stage before use.

Pump runs but no water comes outStop dry running, check the inlet and prime with clean water.
  1. Switch off promptly if the pump is running dry.
  2. Check water availability, flow direction, submerged intake, clear strainers and an open outlet.
  3. Inspect the inlet hose, clips and seals for air leaks. Keep the hose low and direct; remove unnecessary high loops.
  4. Where the fitted pump instructions allow manual priming, isolate power, fill the inlet hose with clean water and reconnect it securely. A clean-water source close to pump level can help distinguish an inlet/lift problem.
  5. Start briefly while watching for continuous water at the outlet. If it still does not draw, stop and contact support.

A steady pump sound alone does not prove that it is properly primed. Do not run it for a fixed ten minutes hoping a blockage will clear, and do not remove safety devices.

Pump silent, stopping or overheatingCheck the safe basics and leave electrical or protection faults isolated.
  1. Switch off and isolate the supply. If there is burning, melting, smoke, a damaged cable or a wet electrical connection, leave it isolated and contact support.
  2. Check the correct power source, accessible plug, fuse and connectors against the unit instructions. A working UV indicator does not prove the pump has power.
  3. If the pump became hot, let it cool fully and check for a blocked filter, empty source, closed outlet or restrictive hose before considering a restart.
  4. If it repeatedly stops or becomes hot again, leave it off and send support the pump label and operating conditions.

Do not bypass thermal or pressure protection, fit a larger fuse to overcome a fault, or adjust an unidentified pressure-switch screw. Live electrical readings and enclosure work require a competent person.

Pump cycling on and offLook for leaks, trapped air, restrictions and the actual pump setup.

On-demand pumps normally stop when outlets close. Unexpected rapid cycling or failure to build pressure needs investigation.

  1. Check for dripping taps, leaks and loose fittings.
  2. Check that the source can supply water and the inlet is airtight.
  3. Check filters, valves and pipework for restrictions.
  4. Confirm the pump/accumulator arrangement against your installation instructions.

Do not guess an accumulator pressure or turn a pressure-switch adjustment screw. Send a photo and the pump label if the basic checks do not resolve it.

A housing or fitting is leakingIsolate the system before checking the seal and housing.
  1. Switch off the pump, isolate electrical power and close the water supply.
  2. Open a suitable outlet to relieve pressure and catch released water.
  3. Check where the leak starts. Look for a displaced O-ring, incorrectly seated cartridge, cross-threaded housing, damaged fitting or crack.
  4. Reseat only a clearly identified, undamaged seal according to its instructions. Do not compensate for damage with extra tightening or an unspecified sealant.
  5. Restore pressure gradually and watch the complete connection for leaks.

Leave a cracked housing or damaged electrical area out of use. Send a close-up photo and your unit details to support for a compatible part.

RO flow, taste or indicator problemsCheck feed, waste, cartridges and power before interpreting the display.
  1. Confirm the feed valve is open and the upstream system is supplying suitable water and pressure.
  2. Check feed and reject-water tubes for kinks, restrictions or incorrect connections.
  3. Check the power adapter and accessible connections with power isolated.
  4. Check cartridge fitting dates, correct seating and whether the post-change reset and flush were completed.
  5. Compare with previous performance. Cold feed water can reduce production; the 1.6-litre/minute figure is a rating, not guaranteed output in every installation.

If a cartridge indicator remains on after a change, follow the exact Reset/Select procedure above for each cartridge. Do not unplug internal tubing or bypass a timeout to clear it.

A TDS reading measures dissolved material, not bacteria or overall drinking safety. Unexpected taste, odour or contamination needs investigation even if TDS is low. Use a known-safe drinking supply while a suspected quality problem is checked.

Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)

Cleaning, smells and stale waterCheck the tank, hoses and filters as well as the unit.

A fishy, stagnant or unusual smell can come from the source, tank, hoses, housings, old cartridges or biofilm. It is not proof of a pump fault. If the water may be unsafe, stop using it for drinking and cooking while it is assessed.

  1. Check the source and tank first. Look for stagnant water, debris and a recent pollution event.
  2. Isolate and depressurise before inspecting housings or replacing suspect, overdue or heavily fouled cartridges.
  3. Clean and sanitise using a water-system product and method confirmed compatible with the actual tank, pump, seals and cartridges. Follow that product’s concentration, contact time and rinsing instructions.
  4. Keep any cleaner away from RO membranes and other sensitive cartridges unless their instructions explicitly permit it. Remove or isolate components only as the matched cleaning procedure directs.
  5. Flush thoroughly with suitable clean water, restore the treatment train and check for leaks.

Do not use a generic teaspoon dose or a universal recirculation time. Tank cleaners and treatment tablets differ in concentration and compatibility. If the smell returns, investigate the whole water path rather than repeatedly adding cleaner.

Keep strainers clear, maintain tank hygiene and change cartridges according to their own limits. Removing a smell alone does not prove the water is safe.

Restart after time awayFlush stale water and check filters, especially after warm weather.

Water left in filters, tanks and pipework can become stale, especially in warm weather. A period without use may mean a cartridge needs replacing earlier.

  1. Inspect the source, tank and system before restarting. Check for leaks, frost damage, odour and fouled filters.
  2. Use the installation’s flush-to-waste route to discharge stale water, following the fitted equipment’s instructions.
  3. Replace suspect or overdue cartridges and complete the relevant post-change flush. Clean or sanitise the system using a compatible approved procedure where needed.
  4. Restore the complete treatment train and check for leaks before normal use.

The app’s water-use calendar pauses assumed usage during time away. It does not pause calendar ageing or establish that stored water and cartridges are hygienic. Flushing for a fixed number of minutes cannot guarantee safety after every period of non-use.

Winter and longer-term storageProtect every water-filled component from frost.

Freezing can damage pumps, housings, UV chambers, cartridges and RO components. Keep the complete installation frost-protected and follow the fitted equipment’s storage procedure.

Draining a visible housing does not prove that the pump, UV chamber or RO is empty. Do not assume a cartridge or membrane can be allowed to dry. Ask for the model-specific storage method if it is not covered by the supplied instructions.

For fixed installations, keep isolation and the flush-to-waste route accessible. On return, inspect for damage and follow the restart guidance before using the water.

Earlier Stage One, Rain and UV modelsUse the fitted components’ instructions rather than current-model assumptions.

Frame-mounted, wall-mounted, V1, V2, V2.1, Mini, Explorer and earlier Rain units can have different pumps, power supplies, dimensions and UV hardware. A current V3.1 drawing or spare part is not automatically compatible.

  • Pump: check its voltage, connector, mounting, pressure and duty rating. Some earlier installations used an AC pump; a mains-powered whole system does not identify the internal pump voltage.
  • UV: distinguish a conventional lamp from LED UV. Some earlier non-LED units used a 16 W lamp with annual lamp guidance. Match the actual module instructions, lamp length and connector before ordering.
  • Filters: match the fitted positions, flow arrows and cartridge labels. Earlier clear-source and canal configurations differ.
  • Power: use the supplied compatible adapter or conversion. Do not transfer current-model cable or wiring guidance to an earlier unit.

Send support a photo of the unit and component label if you need the correct earlier-model instructions or a replacement part.

Buy the right filters and partsCheck size, filter type and compatibility before ordering.

Other replacement filters

Match your fitted cartridge’s size, type and micron rating.

Standard 10 × 2.5-inch cartridges
Cartridge Supplier
50-micron wound sediment View on Amazon UK
10-micron wound sediment View on Amazon UK
5-micron wound sediment View on Amazon UK
5-micron sediment View on Amazon UK
1-micron wound sediment View on Amazon UK
Granular activated carbon (GAC) View on Amazon UK
5-micron carbon block View on Amazon UK
FilterLogic NR600 nitrate cartridge View on Amazon UK

Amazon UK links. We may earn a commission from qualifying purchases.

For standard cartridges, match the 10 × 2.5-inch size, filter type, micron rating, direction and seal design. Similar-looking GAC, nitrate, UF and NanoCeram cartridges do different jobs. Check multipack quantities when comparing prices.

The 20-cartridge Stage One pack is a supply for staggered changes, not a requirement to replace all six filters together or discard the box at six months. The confirmed contents are 5 × 30-micron wound, 4 × 10-micron wound, 3 × 5-micron wound, 4 × carbon block, 2 × GAC and 2 × 1-micron melt-blown sediment.

Use the filter cost calculator for editable source- and usage-based budgeting. It distinguishes individual Stage One changes, Rain’s prefilters and NanoCeram, Stage Two and the paired RO set.

Replacement pumps, switches, UV parts and power supplies need an exact component match. Send the label and a photo rather than selecting a generic part by voltage alone. Current availability and prices are shown in the shop.

Water checks and test resultsTest the concern you actually have and record where the sample came from.

Test strips can help track selected parameters, but they do not test every contaminant or establish overall drinking safety. Use appropriate laboratory testing when assessing a private source, unexplained changes or suspected contamination.

Record the sample date, source or treated-water location, installed treatment stages and cartridge condition. Source and treated samples answer different questions. A filter or UV performance claim applies only within its documented conditions.

Do not collect from a known pollution event or assume that clear water has no dissolved contamination. If the drinking supply is suspect, use a known-safe alternative while it is assessed.

Get helpSend the unit details and a few useful photos so we can diagnose the issue.

Email hello@offgridwater.net with your order number, model, symptoms and when they began. Include a photo of the installation, the relevant component label and any leak or indicator. For flow problems, add the source height, hose length and fitted cartridges.

You can contact us before completing a troubleshooting sequence, especially for a leak, electrical damage or water-quality concern. Do not attempt an unsafe check to qualify for support.

Current general warranty guidance is two years for systems and one year for pumps, subject to the applicable purchase terms and your statutory rights. We will assess the fault and the appropriate remedy; a troubleshooting result alone is not an automatic replacement authorisation.

Find installation help for plumbing work or a fixed installation.

Manuals & diagrams

Offgrid Final Stage Reverse Osmosis Unit · Owner’s manual (PDF)

English edition for model A8.

Installation photos & diagrams

Examples show particular units and installations. Follow the markings and instructions for your fitted components.

Filter direction
Cartridge water path
Stage Two with a UK hose and fittings kit
RO installation example
RO drain connection

Contact support

Send your order number, unit, water source and a short description. A photo of the setup or video of the fault helps.

Warranty & support

We're here to help with your system. Our warranty is a parts warranty: we supply the replacement part, you fit it, and we'll help you through it. We've made components as straightforward to replace as possible. Callouts aren't included.

Systems have a two-year warranty for covered mechanical and electrical faults. Pumps have a one-year warranty, unless your product listing states otherwise. Routine maintenance, wear and exhausted consumables aren't covered. Your statutory rights are unaffected.

Full warranty and returns terms